| |
1. General information
The container terminal of the JSC «Novoroslesexport» started to operate in the year 1999. Each year of its work may be indicated as a year when the volume of container transshipment has considerably increased and the quality of services rendered has really been improved.
The terminal was designed for handling (loading/discharge) of container vessels, intermediate storage of containers at the warehouse area, completion of container parties and loading/discharge of container platforms as well.
Presently the terminal is located on the territory of the Area №5 and partially on the territory of the Area № 2 of the JSC “Novoroslesexport”. The berth № 28A is used for loading/discharge of container vessels. The advantageous position of this berth provides safety for moorage of vessels being “pressed” to the berth by the north-east wind prevailing in this area. Nowadays at the terminal vessels with capacity up to 5 000 TEU including PANAMAX containerships are being handled, service of the biggest container lines like MSC, CMA CGM, Evergreen, Hapag-Lloyd, CSCL, EMES, NORASIA is carried out.
2. Technological objects as a part of terminal:
- Seaside loading front;
- Railway loading front;
- Sorting and warehousing area;
- Platform for storage of reefer containers;
- Container re-stuffing platform;
- Platform for customs inspection of containers;
- Inspection and checking complex (ICC);
- Checkpoints.
3. Container terminal equipment
| INFRASTRUCTURE |
| Berth |
Length, м |
Projected depth, м
from zero point of Port Novorossiysk
| Guaranteed depth, м
from zero point of Port Novorossiysk
|
| № 28А |
100 |
8,25 |
8,0 |
| № 28 |
162 |
9,65 |
9,3 |
| № 29 |
182 |
13,9 |
13,0 |
| № 30 |
122,8 |
13,9 |
13,0 |
|
|
Warehouse capacity |
10 260 TEU |
| Ref. container plugs |
432 units |
| 1 |
| Equipment |
| Name |
Producer |
Quantity |
Carrying capacity |
| Mooring container loaders (STS) |
ZPMC |
2 |
42 т |
| Mobile cranes |
Gottwald
Liebherr |
2 |
104 т
64 т |
| Mobile pneumatic-tired gantry crane(RTG) |
ZPMC |
2 |
41 т |
| Double-cantilever track-mounted gantry crane(RMG) |
ZPMC |
1 |
41 т |
| Rich stacker |
SMV, Ferrari |
9 |
45 т |
| Loader-piler for emply containers |
SMV |
1 |
9т (7 stages) |
| Terminal trailers |
Terberg |
2 |
50 т |
| MAZ |
12 |
25 т |
| Forklift loaders |
Ferrari |
1 |
16,6 т |
| Hyundai |
2 |
5 т |
| Toyota |
2 |
2 т |
| 1 |
|
|
|
The JSC “Novoroslesexport” container terminal output makes 350 000 TEU per year.
At the present time realization of container terminal development for increasing transshipment values is finished (see details in section Investment projects).
| |
Our address:
2, Mira str., Novorossiysk, 353900
Krasnodar Region, Russia
Tel: +7(8617) 600-401 – reception of the General Director
Fax: +7(8617) 614-499 – registry office
E-mail: referent@nle.ru |
|
|